Client: Scottish NHS board
Sector: Healthcare / education
Service: Air conditioning installation and commissioning
The brief
The library in a hospital education centre needed reliable cooling to keep the space comfortable for the staff and students who study and train there. The board asked GMA for a solution that would be neat, robust and easy to maintain over the long term.
What we did
- Supplied and installed two Daikin high-wall split air conditioning systems
- Mounted the outdoor units at ground level on rubber anti-vibration mounts to keep noise and vibration down
- Ran all interconnecting pipework and cabling on medium-duty cable tray, double-layered for mechanical protection – important in a busy hospital environment
- Installed external condensate drain pipes with protective tray work
- Pressure tested with oxygen-free nitrogen and evacuated to below 2 Torr before charging, in line with good F-Gas practice
- Commissioned and fully tested both systems, recorded all commissioning data and completed a full client handover


The result
The library now has dependable, efficient cooling. The work was completed within two days, scheduled around the library's opening times to minimise disruption to staff, library users and general hospital services. No issues were reported at handover, and the board has full commissioning records for its asset register and future maintenance.
Why GMA
- F-Gas certified engineers (REFCOM)
- Accredited Daikin, Mitsubishi Electric and Toshiba installer
- SafeContractor approved
- Experienced in working on live NHS sites
Planning air conditioning for a healthcare, education or commercial building? Find out more about our air conditioning installation or request a free survey and quote.